Courtenay, ND | Xcel Energy and Wanzek Construction. Courtenay is an 115kV 240MVA dual MPT collector sub with (8) 34.5kV Feeder Circuits and (3) 115kV ...
Newkirk, OK | Frontier Windpower, LLC and Wanzek Construction. Frontier is a 211 MVA 345kV Collector Substation with an open-air tubular aluminum bus design consisting ...
Newkirk, OK | Frontier Windpower, LLC and Wanzek Construction. The Frontier Transmission Line a 5 mile 345kV double bundled 795 ACSR line built with guyed ...
O’Donnell, TX | Stephens Ranch Wind Energy/Wanzek Construction. This 345/34.5kV – 235MVA wind farm collector substation is an ongoing project which will tie into the ...